Skip to content

Construction cleaning · Phoenix, AZ

Construction cleaning, phase by phase

All three phases of new-construction cleaning for builders and contractors, and a post-construction clean for homeowners after a remodel. From debris and drywall dust to a move-in-ready walkthrough.

  • 100% satisfaction guarantee
  • Builders, contractors and homeowners
  • Mon–Sat, 7 AM–6 PM
  • English and Spanish
Kitchen under construction with tools and dust on the floor

The three phases

Each phase happens at a different point in the build, so each one is booked on its own.

Phase 1 · Rough clean

  • Debris and scraps out
  • Rough clean while work is still going on
  • Floors swept

Phase 2 · After the finishes

  • Dust off walls, windows and cabinets
  • Paint, sticker and label residue
  • Window tracks and frames

Phase 3 · Final touch-up

  • Final touch-up before the walkthrough or closing
  • Last dust off surfaces and fixtures
  • Floors move-in ready

Add when you need it

  • Fine drywall dust off every surface
  • Inside cabinets and drawers, if you ask
  • Kitchen deep clean: inside the oven and fridge
  • Interior windows (ask about our packages)

For builders and contractors

Tell us the address, the stage of the project and the walkthrough or closing date. We schedule each phase when the trades are ready for it, and you have one contact by text or phone for the whole job.

For homeowners after a remodel

Construction dust is fine and gets everywhere: into vents, cabinets, light fixtures and the tracks of every window. A regular house cleaning isn’t built for it. Book a post-construction clean once the contractor is done, then switch to regular cleaning.

Good to know before we come

  • Tell us whether water and power are on at the site.
  • Tell us what is still being worked on, so we don’t clean ahead of a trade.
  • Share the walkthrough or closing date, so phase 3 lands right before it.

How a construction job runs

  1. Send the projectAddress, stage, square feet and your target dates.
  2. Get a price per phaseEach phase is priced on its own, so you only book what you need.
  3. We clean each phaseOn your timeline, Monday through Saturday.
  4. Ready for the walkthroughAnything flagged at the walkthrough, we take care of within 24 hours.
Vacuum cleaner working on a tile floorFinished kitchen with a marble island, ready to move inFinished bathroom with glass shower and white tile

Construction cleaning questions

What happens in each phase?

Phase 1 clears debris and does a rough clean while work is still going on. Phase 2 removes the dust from walls, windows and cabinets once the finishes are in. Phase 3 is the final touch-up right before the walkthrough or closing.

Can I book only the final clean?

Yes. You can book a single phase, or one post-construction clean for a finished home.

Do you work with builders on more than one home?

Send us the addresses and the timelines, and we schedule the phases for each home.

How soon can you come?

It depends on the schedule that week. Text us your target date as early as you can; we work Monday through Saturday, 7 AM to 6 PM.

Project almost done?

Send the stage and your walkthrough date. We reply with a price per phase.

Build a detailed quote